Difference between revisions of "Run Planning Meeting Notes, Nov 8-Nov 14, 2018"
From GlueXWiki
(→Thursday, Nov 8 at 08:45) |
(→Thursday, Nov 8 at 08:45) |
||
Line 16: | Line 16: | ||
#* Beam tuning (deferred) | #* Beam tuning (deferred) | ||
#* Data taking with reduced PS field, coherent edge at 7GeV | #* Data taking with reduced PS field, coherent edge at 7GeV | ||
− | #** [ | + | #** [https://logbooks.jlab.org/entry/3622899 Rates] |
#** Low energy running [https://docs.google.com/spreadsheets/d/1qJv80NKS1zCrBj5utogCAIBo5KZXtTocV0fc5pqfx_0/edit?usp=sharing Trigger Spreadsheet] | #** Low energy running [https://docs.google.com/spreadsheets/d/1qJv80NKS1zCrBj5utogCAIBo5KZXtTocV0fc5pqfx_0/edit?usp=sharing Trigger Spreadsheet] | ||
#Issues | #Issues |
Revision as of 09:33, 8 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 8
- Hall D schedule for week 9
Thursday, Nov 8 at 08:45
- Last 24h:
- TAC run with empty target, v-wire at 50nA, reduced field in PS (400A), low E TAGH counters on
- Beam tuning (deferred)
- Data taking with reduced PS field, coherent edge at 7GeV
- Rates
- Low energy running Trigger Spreadsheet
- Issues
- PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
- beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
- EPICS froze for 2h, started working without intervention
- Reports
- Monitoring
- Plans
- Notes