Difference between revisions of "Controls Meeting 20-Sep-2018"
From GlueXWiki
Line 6: | Line 6: | ||
* ComCal | * ComCal | ||
** Translation stages (Tim, Vanik) | ** Translation stages (Tim, Vanik) | ||
− | ** [[File:ComCalVoltages_20_09_28.pdf | Voltages]] ( | + | ** [[File:ComCalVoltages_20_09_28.pdf | Voltages]] (Vanik, Nick) |
**: Interlocks for CAEN modules | **: Interlocks for CAEN modules | ||
** LED pulser (Hovanes) | ** LED pulser (Hovanes) |
Revision as of 08:25, 20 September 2018
- Announcements
- Solenoid status (Tim,Beni,Brian)
- Liquid level : sensors vs formulae
- ROOT GUIs on RHEL7
- Time offset
- ComCal
- Translation stages (Tim, Vanik)
- File:ComCalVoltages 20 09 28.pdf (Vanik, Nick)
- Interlocks for CAEN modules
- LED pulser (Hovanes)
- Temperature monitoring (Nick)
- Chiller
- DIRC controls
- Voltages (Nick, Vanik)
- MPOD boards
- LED Pulser (Hovanes)
- Scalers and Temperatures (Hovanes)
- Interlocks
- Voltages (Nick, Vanik)
- Other
Time/Location
10:00AM Thursday 20-Sep-2018 CC B101