Difference between revisions of "June 14, 2018 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 22: | Line 22: | ||
# Bar box transportation and installation (Tim, Mark) | # Bar box transportation and installation (Tim, Mark) | ||
#* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2018-June/000359.html Notes from the road] (Matt) | #* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2018-June/000359.html Notes from the road] (Matt) | ||
− | #* [[Media:BARBOX_Lessons_Learned.pdf|Lessons Learned]] | + | #* [[Media:BARBOX_Lessons_Learned.pdf|Lessons Learned]] for upper bar box installation (Tim) |
# Optical box | # Optical box | ||
#*Status update (Ernie and Jason) | #*Status update (Ernie and Jason) | ||
Line 29: | Line 29: | ||
#** Window procurement | #** Window procurement | ||
#** Dark box conceptual design | #** Dark box conceptual design | ||
− | #* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]] | + | #* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]] |
# Simulation studies (Maria and Roman) | # Simulation studies (Maria and Roman) | ||
# [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_June_14_v2.pdf MAPMT testing] (Bill) | # [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_June_14_v2.pdf MAPMT testing] (Bill) | ||
# AOB | # AOB |
Latest revision as of 10:14, 14 June 2018
Meeting Information
GlueX DIRC Meeting
Thursday June 14, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Experimental Readiness Review June 25
- Practice talks Monday @ 1:30 pm
- Collaboration meeting June 21-23
- Experimental Readiness Review June 25
- Bar box transportation and installation (Tim, Mark)
- Notes from the road (Matt)
- Lessons Learned for upper bar box installation (Tim)
- Optical box
- Status update (Ernie and Jason)
- DIRC installation schedule
- Simulation studies (Maria and Roman)
- MAPMT testing (Bill)
- AOB