Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"
From GlueXWiki
m |
m |
||
Line 22: | Line 22: | ||
#**High rate DAQ tests (9.30 am) | #**High rate DAQ tests (9.30 am) | ||
#**Injector recovery (MCC, possible beam down ~1hr) | #**Injector recovery (MCC, possible beam down ~1hr) | ||
− | #** | + | #**Level 1 trigger studies |
#*Saturday | #*Saturday | ||
#**Production Running | #**Production Running | ||
Line 29: | Line 29: | ||
#*Longer term run plan/Other items | #*Longer term run plan/Other items | ||
#**Resumption of raster scan studies | #**Resumption of raster scan studies | ||
− | #** | + | #**Access for Muon detector |
+ | #**Tour | ||
+ | #**TAC Run (Wednesday) | ||
#*End of run preparation | #*End of run preparation | ||
#**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6 | #**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6 |
Revision as of 09:27, 27 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- High intensity DAQ tests [10]
- Running with 750 um converter [11]
- TPOL runtime estimate - R. Jones
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- Injector recovery (MCC, possible beam down ~1hr)
- Level 1 trigger studies
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan/Other items
- Resumption of raster scan studies
- Access for Muon detector
- Tour
- TAC Run (Wednesday)
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [12]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB