Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"
From GlueXWiki
m |
|||
Line 15: | Line 15: | ||
#* Time differences in monitoring plots [https://logbooks.jlab.org/entry/3567859] | #* Time differences in monitoring plots [https://logbooks.jlab.org/entry/3567859] | ||
# Reports: | # Reports: | ||
+ | #* High intensity DAQ tests [https://logbooks.jlab.org/entry/3568068] | ||
#* Running with 750 um converter | #* Running with 750 um converter | ||
#** [https://docs.google.com/presentation/d/1nosxQB76tMsh6tiTRi-2B7UbXwqNE4ksdQ3w2ic6rhg/edit?usp=sharing TPOL runtime estimate] - ''R. Jones'' | #** [https://docs.google.com/presentation/d/1nosxQB76tMsh6tiTRi-2B7UbXwqNE4ksdQ3w2ic6rhg/edit?usp=sharing TPOL runtime estimate] - ''R. Jones'' |
Revision as of 09:08, 27 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- High intensity DAQ tests [10]
- Running with 750 um converter
- TPOL runtime estimate - R. Jones
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- Injector recovery (MCC, possible beam down ~1hr)
- TAC Run (2 pm)
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan/Other items
- Resumption of raster scan studies
- Level 1 trigger studies
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [11]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB