Difference between revisions of "March 8, 2018 DIRC"
From GlueXWiki
(→Agenda) |
|||
Line 30: | Line 30: | ||
#** Other items and quotes | #** Other items and quotes | ||
#* Geometry for alignment studies (Bill) | #* Geometry for alignment studies (Bill) | ||
− | # Simulation studies (Maria and Roman) | + | # Simulation studies (Maria and Roman) ([https://web-docs.gsi.de/~rdzhigad/www/research/pionkaon-sep-power pi/K separation power]) |
# MAPMT testing (Bill) | # MAPMT testing (Bill) | ||
# AOB | # AOB |
Revision as of 08:36, 8 March 2018
Meeting Information
GlueX DIRC Meeting
Thursday March 8, 2018
10:00 am, EDT
JLab room F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Support structure update (John, Tim, Tom, Mark)
- Investigations bar box and optical box movement in the hall
- Roll fixture testing
- Bar box transportation (dates chosen)
- May 29 - 31: loading at SLAC
- June 6-7: delivery to JLab
- Optical box
- Status update (Ernie and Jason)
- Box production at Lesker: final production drawings (?)
- PMT test fixture
- 3D Model status
- Other items and quotes
- Geometry for alignment studies (Bill)
- Status update (Ernie and Jason)
- Simulation studies (Maria and Roman) (pi/K separation power)
- MAPMT testing (Bill)
- AOB