Difference between revisions of "Run Planning Meeting Notes, Feb 12-Feb 28, 2018"
From GlueXWiki
(→Sunday, February 25) |
(→Sunday, February 25) |
||
Line 66: | Line 66: | ||
#* [https://logbooks.jlab.org/entry/3537996 FDC Occupancy plots] | #* [https://logbooks.jlab.org/entry/3537996 FDC Occupancy plots] | ||
#* [https://logbooks.jlab.org/entry/3538196 Low level monitoring] | #* [https://logbooks.jlab.org/entry/3538196 Low level monitoring] | ||
− | |||
#* FCAL pedestals check - re pi0 peak small shift (Matt's question) | #* FCAL pedestals check - re pi0 peak small shift (Matt's question) | ||
#* ADC in slot 16 of the TOF crate is commented out in the config file | #* ADC in slot 16 of the TOF crate is commented out in the config file |
Revision as of 11:22, 25 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, February 22
- Notes from the previous 24 hours:
- Continued production data until 1:30pm
- Secretary Perry toured Hall D
- Beam delivery shaky: Swing shift summary
- DAQ/cMesg/rootSPY issues
- Dipole trip
- Transmission looks ok
- Production data
- Issues:
- Harp scan EPICS screenshot
- FDC trips: issue on 1 channel; Beni lowered the bias.
- Large Y-oscillations in 511C
- Photon beam intensity anomaly
- Reports (?):
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan once beam returns
- Production data
Friday, February 23
- Notes from the previous 24 hours:
- Production data
- Beam taken away 11:15-14:14 for linac issues
- Owl Shift Summary: rho, omega, phi triggers
- Issues:
- ADC in slot 16 of the TOF crate is still commented out in the config file
- FDC TDC-ADC timing shifts
- Are these issues?: Problem starting run, ROCSTPSC2 and ROCTAGM2 have no events, Power cycle the ROCTRIG2 and Start the DAQ again, ROCFCAL3
- Reports (?):
- Planning:
- 100nA 10-4 radiator
- nA BPM commissioning: Rate dependence, Flux, Polarization
- Current timings, CDC and FDC timings
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan at 7am
- Production data
Saturday, February 24
- No Hall D Counting Room meeting due to Collaboration Meeting
Sunday, February 25
- Notes from the previous 24 hours:
- Production data
- Scan result for HALO
- Issues:
- Missing channels on Tagger Miscrope?
- FDC Occupancy plots
- Low level monitoring
- FCAL pedestals check - re pi0 peak small shift (Matt's question)
- ADC in slot 16 of the TOF crate is commented out in the config file
- Reports:
- Hall D Cavity BPMs initial steps underway, more work on Monday
- Energy oscillations
- Beam position update
- AC x-response
- Planning:
- Move collimator+beam
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- CDC 160 ns shift: bring window even closer, narrow its width? Revert to CDC integral mode.
- MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning
- Production data
Monday, February 26
- Notes from the previous 24 hours:
Tuesday, February 27
- Notes from the previous 24 hours:
Wednesday, February 28
- Notes from the previous 24 hours: