Difference between revisions of "Run Planning Meeting Notes, Feb 12-Feb 28, 2018"
From GlueXWiki
(→Friday, February 23) |
|||
Line 56: | Line 56: | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | + | #* Production data | |
+ | # Issues: | ||
+ | #* ADC in slot 16 of the TOF crate is still commented out in the config file | ||
+ | #* [https://logbooks.jlab.org/entry/3536533 FDC TDC-ADC timing shifts] | ||
+ | # Reports (?): | ||
+ | #* ROCSTPSC2 etc, any updates? | ||
+ | #* [https://logbooks.jlab.org/entry/3537161 Beam position update] | ||
+ | #* [https://logbooks.jlab.org/entry/3536973 Low level monitoring report] | ||
+ | # Planning: | ||
+ | #* [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week7.jpg 100nA 10-4 radiator] | ||
+ | #* nA BPM commissioning: [https://halldweb.jlab.org/DocDB/0035/003538/001/stevens_systematics.pdf Rate dependence, Flux, Polarization] | ||
+ | #* [https://logbooks.jlab.org/entry/3536915 Current timings], [https://logbooks.jlab.org/entry/3536858 CDC and FDC timings] | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Harp scan at 7am | ||
+ | #* Production data | ||
== Sunday, February 25 == | == Sunday, February 25 == |
Revision as of 15:59, 23 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, February 22
- Notes from the previous 24 hours:
- Continued production data until 1:30pm
- Secretary Perry toured Hall D
- Beam delivery shaky: Swing shift summary
- DAQ/cMesg/rootSPY issues
- Dipole trip
- Transmission looks ok
- Production data
- Issues:
- Harp scan EPICS screenshot
- FDC trips: issue on 1 channel; Beni lowered the bias.
- Large Y-oscillations in 511C
- Photon beam intensity anomaly
- Reports (?):
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan once beam returns
- Production data
Friday, February 23
- Notes from the previous 24 hours:
- Production data
- Beam taken away 11:15-14:14 for linac issues
- Owl Shift Summary: rho, omega, phi triggers
- Issues:
- ADC in slot 16 of the TOF crate is still commented out in the config file
- FDC TDC-ADC timing shifts
- Are these issues?: Problem starting run, ROCSTPSC2 and ROCTAGM2 have no events, Power cycle the ROCTRIG2 and Start the DAQ again, ROCFCAL3
- Reports (?):
- Planning:
- 100nA 10-4 radiator
- nA BPM commissioning: Rate dependence, Flux, Polarization
- Current timings, CDC and FDC timings
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan at 7am
- Production data
Saturday, February 24
- Notes from the previous 24 hours:
- Production data
- Issues:
- ADC in slot 16 of the TOF crate is still commented out in the config file
- FDC TDC-ADC timing shifts
- Reports (?):
- ROCSTPSC2 etc, any updates?
- Beam position update
- Low level monitoring report
- Planning:
- 100nA 10-4 radiator
- nA BPM commissioning: Rate dependence, Flux, Polarization
- Current timings, CDC and FDC timings
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan at 7am
- Production data
Sunday, February 25
- Notes from the previous 24 hours:
Monday, February 26
- Notes from the previous 24 hours:
Tuesday, February 27
- Notes from the previous 24 hours:
Thursday, February 28
- Notes from the previous 24 hours: