Difference between revisions of "October 10, 2017 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 23: | Line 23: | ||
#* Water system testing (Tim) | #* Water system testing (Tim) | ||
#* Design and PMT mounting update (Ernie and Jason) | #* Design and PMT mounting update (Ernie and Jason) | ||
− | #* Simulation studies (Maria and Roman) ([https://web-docs.gsi.de/~rdzhigad/www/research/hitpatterns-hdgeant4 patterns with | + | #* Simulation studies (Maria and Roman) ([https://web-docs.gsi.de/~rdzhigad/www/research/hitpatterns-hdgeant4 patterns with hdgeant4]) |
#* Electronics (Fernando) | #* Electronics (Fernando) | ||
# Bar box transportation and monitoring | # Bar box transportation and monitoring |
Revision as of 13:09, 10 October 2017
Meeting Information
GlueX DIRC Meeting
Tuesday October 10, 2017
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Support structure update (John, Tim, Tom)
- Delivery and assembly status
- Nitrogen system in Hall (Tom)
- Optical box
- Water system testing (Tim)
- Design and PMT mounting update (Ernie and Jason)
- Simulation studies (Maria and Roman) (patterns with hdgeant4)
- Electronics (Fernando)
- Bar box transportation and monitoring
- Preparations for 1st bar box shipment: Nov 1-3
- Timeline discussion
- AOB