Difference between revisions of "May 5, 2008 Calorimetry"
From GlueXWiki
(→Minutes) |
|||
Line 20: | Line 20: | ||
#* [[Private:Fiber Specs | Fiber Specifications]] (Elton) | #* [[Private:Fiber Specs | Fiber Specifications]] (Elton) | ||
#* Fiber Testing (evaluation, production) | #* Fiber Testing (evaluation, production) | ||
− | # FCAL Update [[http://www.jlab.org/Hall-D/software/wiki/images/5/5e/FADC_Maj2008a.pdf][FADC time resolution measurement] | + | # FCAL Update [[http://www.jlab.org/Hall-D/software/wiki/images/5/5e/FADC_Maj2008a.pdf][FADC time resolution measurement] (Mihajlo) |
# Calibration system update (Christina) | # Calibration system update (Christina) | ||
#* [[Calibration-Monitoring]] | #* [[Calibration-Monitoring]] |
Revision as of 11:16, 5 May 2008
Connection
- The meeting will be held at 10:30 am ET
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Reference Documents
- Previous minutes: April 21, 2008 Calorimetry
- Schedule, Tracker and Drawings (gluex pass)
- Schedule
Agenda
- BCAL Update
- Report on the visit to Alberta (George/Zisis)
- Fiber Specifications (Elton)
- Fiber Testing (evaluation, production)
- FCAL Update [[1][FADC time resolution measurement] (Mihajlo)
- Calibration system update (Christina)
- Collaboration meeting On the schedule we have 1:15 min (what do we want to report? who?)
- FCAL: a) results of light guide surface treatment, b) mechanical cell wall design c) timing measurements using the FADC
- BCAL: a) Construction b) Readout/SiPMs, (Carl can give an update on JLab measurements)
- Calibration:
- Monte Carlo:
- Any other business
Minutes
Online: Elton, Beni, ELke, Christina, Matt. Mihajlo, John, Zisis, Andrei, George
- BCAL
- Report on the visit to Alberta Media:UofAMeeting080429.pdf; increased role of Alberta; scheduling on the CNC machine
- Fiber specs: Elton update the specs on the DocDB ([2]) with all comments he received. It can be sent on to procurement to prepare for a bid package. Regina findings in connection to the manufacturer's claim of fiber spectral response and no of photons produced per MeV were discussed. A NIM article is in preparation.
- Fiber Testing: new parallel setup at JLab, absolute light output measurement, to accommodate SiPM in one line and fibers in the other.
- FCAL: see link above to presentation for the collaboration meeting.
- Calibration and Monitoring (see link above).
- Collaboration Meeting Preparations
- FCAL
- BCAL
- Calibration
- Monte Carlo
- Other business