Difference between revisions of "Run Planning Meeting Notes, Feb 23- Mar 1, 2017"
From GlueXWiki
(→Friday, February 24) |
(→Saturday, February 25) |
||
Line 99: | Line 99: | ||
==Saturday, February 25 == | ==Saturday, February 25 == | ||
+ | {|border | ||
+ | |- | ||
+ | ! Shift !! ABU !! BNA !! BANU | ||
+ | |- | ||
+ | |Day || 4.27 || 2.49 || 1.24 | ||
+ | |- | ||
+ | |Swing || 2.63 || 4.93 || 0.44 | ||
+ | |- | ||
+ | |Owl || 5.20 || 0.78 || 2.03 | ||
+ | |- | ||
+ | |Total ||12.09 || 8.20 || 3.72 | ||
+ | |- | ||
+ | |} | ||
# Accelerator Status over the last 24 hrs | # Accelerator Status over the last 24 hrs | ||
#* Beam was mostly: | #* Beam was mostly: | ||
− | #** | + | #** somewhat "trippy" in the afternoon |
+ | #** stable during the night | ||
+ | #* Down times | ||
+ | #** 7:30 - 23:23 [[https://logbooks.jlab.org/entry/3462354 VIP1L07B tripped off]] | ||
#* Harp scans: | #* Harp scans: | ||
− | #** | + | #** [[https://logbooks.jlab.org/entry/3462211 MCC]], [[https://logbooks.jlab.org/entry/3462208 Radiator Harp]] |
− | #** | + | #** [[https://logbooks.jlab.org/entry/3462220 Analysis]], PS rates look good decided to start running and not refocus. |
# Hall-D/GlueX items | # Hall-D/GlueX items | ||
#* switched to 150nA | #* switched to 150nA | ||
#* adjusted detectors | #* adjusted detectors | ||
#* DAQ data rate 50kHz | #* DAQ data rate 50kHz | ||
+ | #* created new reference plots for radiator GUI | ||
#* In the last 24 hours: | #* In the last 24 hours: | ||
− | #** Feb | + | #** Feb 25: Total triggers collected: M |
#** Current Total: 27.1 B | #** Current Total: 27.1 B | ||
− | |||
# Issues | # Issues | ||
− | #* | + | #* 23:23 - 02:00 [[https://logbooks.jlab.org/entry/3462359 Chiller communication problem]], [[https://logbooks.jlab.org/entry/3462402 resolved]] |
+ | |||
#* DAQ issues: | #* DAQ issues: | ||
#** | #** | ||
# Monitoring | # Monitoring | ||
− | #* | + | #* reference plots need to be updated for 150nA running |
# Run Plan | # Run Plan | ||
#* Take production data at 150nA | #* Take production data at 150nA |
Revision as of 10:55, 25 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, February 23
Shift | ABU | BNA | BANU |
---|---|---|---|
Day | 5.11 | 1.07 | 1.82 |
Swing | 6.46 | 0.77 | 0.76 |
Owl | 2.35 | 0.00 | 5.65 |
Total | 13.92 | 1.85 | 8.23 |
- Accelerator Status over the last 24 hrs
- Beam was mostly
- Stable until midnight
- Harp scans:
- Beam was re-focused around noon ELOG
- final MCC scans : IHA5C11, IHA5C11B
- Radiator HARP scans: Radiator Harp
- (Sigma_X, Sigma_Y) is (0.85,0.55), (0.65, 0.49), and (0.73, 0.43).
- new Harp scans as part of beam steering problem: MCC, Radiator Harp
- Beam was mostly
- Hall-D/GlueX items
- Downtime incidents of more than 30 minutes:
- DAQ 10:45 for about 40 min. , Sergey helped
- Beam position lock on active collimator steered the beam away: 00:15
- Traced problem to pre-amp problem in inner AC (dead or needs to be reset, power cycled ?)
- Total triggers collected: 1400 M
- Downtime incidents of more than 30 minutes:
- Issues
- Active collimator
- DAQ issues:
- difficult restart at 10:45pm
- Monitoring
- Run Plan
- Repair active collimator.
- HIgh luminosity ?
- Offline Analysis?
- Any Other Business?
Friday, February 24
Shift | ABU | BNA | BANU |
---|---|---|---|
Day | 3.12 | 1.31 | 3.57 |
Swing | 6.13 | 0.72 | 1.15 |
Owl | 5.76 | 1.96 | 0.28 |
Total | 15.01 | 4.00 | 5.00 |
- Accelerator Status over the last 24 hrs
- Beam was mostly:
- Stable : Beam current and positions
- Harp scans:
- Beam line, Radiator Harp, before AC repair
- (Sigma_X, Sigma_Y) is (0.85,0.55), (0.93, 0.55), and (0.64, 0.46).
- After AC repair: Radiator Harp
- Beam was mostly:
- Hall-D/GlueX items
- In the last 24 hours:
- Feb 23: Total triggers collected: 1580 M
- Current Total: 27.1 B
- Trigger studies (Sasha)
- TRD test (Lubomir)
- Tested new tagger microscope settings for high luminosity (Alex)
- In the last 24 hours:
- Issues
- Active Collimator repair
- Rebooting IOC did not help
- Alex Barnes and Trent Allison found problem to be low voltage power supply, repair completed 11:55am ELOG.
- DAQ issues:
- Crash, Sergey helped recovering (approx. 45 min)
- Active Collimator repair
- Monitoring
- Low-level monitoring report
- Increase of missing FCAL channels:30770, 30778,30780, 30783
- Run Plan
- Current Plan
- Long mode run ?
- Empty target run ?
- TAC run ?
- High luminosity ?
- Offline Analysis
- Any Other Business
Saturday, February 25
Shift | ABU | BNA | BANU |
---|---|---|---|
Day | 4.27 | 2.49 | 1.24 |
Swing | 2.63 | 4.93 | 0.44 |
Owl | 5.20 | 0.78 | 2.03 |
Total | 12.09 | 8.20 | 3.72 |
- Accelerator Status over the last 24 hrs
- Beam was mostly:
- somewhat "trippy" in the afternoon
- stable during the night
- Down times
- 7:30 - 23:23 [VIP1L07B tripped off]
- Harp scans:
- [MCC], [Radiator Harp]
- [Analysis], PS rates look good decided to start running and not refocus.
- Beam was mostly:
- Hall-D/GlueX items
- switched to 150nA
- adjusted detectors
- DAQ data rate 50kHz
- created new reference plots for radiator GUI
- In the last 24 hours:
- Feb 25: Total triggers collected: M
- Current Total: 27.1 B
- Issues
- 23:23 - 02:00 [Chiller communication problem], [resolved]
- DAQ issues:
- DAQ issues:
- Monitoring
- reference plots need to be updated for 150nA running
- Run Plan
- Take production data at 150nA
- Offline Analysis
- Any Other Business