#** Alexandre has retrieved supplemental dosimetry from the tagger | #** Alexandre has retrieved supplemental dosimetry from the tagger | ||
#** Production restarted at 17:30 | #** Production restarted at 17:30 | ||
− | #* Stable beam since then (max 10 minutes off) | + | #* Stable beam since then (max 10 minutes off on 2 occasions) |
#* Radiation levels are about the same as earlier [https://logbooks.jlab.org/entry/3458938] | #* Radiation levels are about the same as earlier [https://logbooks.jlab.org/entry/3458938] | ||
#* Harp scans: [https://logbooks.jlab.org/entry/3458936 MCC] and [https://logbooks.jlab.org/entry/3459009 ours]. | #* Harp scans: [https://logbooks.jlab.org/entry/3458936 MCC] and [https://logbooks.jlab.org/entry/3459009 ours]. |
Revision as of 08:11, 17 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Friday, February 17
- Accelerator Status
- Hall was in controlled access from 7:00 till 16:30 for RF separator studies
- Work on TRD GEM by Kondo during this time
- Alexandre has retrieved supplemental dosimetry from the tagger
- Production restarted at 17:30
- Stable beam since then (max 10 minutes off on 2 occasions)
- Radiation levels are about the same as earlier [1]
- Harp scans: MCC and ours.
- In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
- (0.83, 0.32), (0.63, 0.24), (0.68, ??? - the fit has failed)
- Beam is ~20% tighter in X and twice narrower in Y comparing with a day ago
- Photon transmission is about the same as a day ago
- In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
- BPM calibration?
- AD00 BPM is no longer the same as AD00C BCM but only 40% of it [2]
- Hall was in controlled access from 7:00 till 16:30 for RF separator studies
- Hall-D/GlueX items
- In the last 24 hours:
- ABU 10.32 hrs (0 + 4.54 + 5.78), BANU 2.13 hrs (0 + 1.17 + 0.96)
- Total triggers collected: 994 M
- The usual DAQ and RootSpy issues make shifts entertaining
- In the last 24 hours:
- Monitoring
- 32ns TDC-ADC offsets:
- Low Level Monitoring Report Feb 16
- Run Plan
- Production, production, production...
- Sascha's trigger studies?
- Offline Analysis?
- Any Other Business?
Thursday, February 16
- Accelerator Status
- Stable accelerator running over the last 24 hours
- Harp scans:
- MCC scans before and after Todd's script
"Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok." - Our scan: before and after Todd's script
- In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
- Before: (1.31, 0.63), (1.08, 0.73), (1.03, 0.41)
- After : (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
- MCC scans before and after Todd's script
- Convergence studies from Hovanes: Feb 15 vs Feb 9
- Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
"... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot."
- Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
- Work on RF separation will start at 7:30 AM today and last for 2-3 hours
- Hall-D/GlueX items
- In the last 24 hours:
- ABU 17.66 hrs (4.97 + 6.37 + 6.32), BANU 2.21 hrs (1.27 + 0.40 + 0.54)
- Total triggers collected: 1856 M
- A usual assortment of DAQ crashes
- RootSpy tips:
- Restarting cMsg server
- Multiple instances of RootSpy on gluon47
"... no more than 1 or 2 instances running in the counting house at any point in time."
- New BCAL gain constants in ccdb [5]
- In the last 24 hours:
- Monitoring
- A new instance of 32ns ADC-TDC offset: [6]
- Run Plan
- 7:00 AM - 7:30 AM ==> Hall safety walk-through (After RADCON does it job)
- 7:30 AM - about 10 AM ==> MCC works on RF separation
- A new harp scan after RF separation work is done
- Production data
- Offline Analysis?
- Any Other Business?