Difference between revisions of "Run Planning Meeting Notes, Feb 16-Feb 22, 2017"
From GlueXWiki
m |
m |
||
Line 10: | Line 10: | ||
#* Stable accelerator running over the last 24 hours | #* Stable accelerator running over the last 24 hours | ||
#* Harp scans: | #* Harp scans: | ||
− | #** MCC scans [https://logbooks.jlab.org/entry/3458630 before] and [https://logbooks.jlab.org/entry/3458638 after] Todd's script | + | #** MCC scans [https://logbooks.jlab.org/entry/3458630 before] and [https://logbooks.jlab.org/entry/3458638 after] Todd's script <br \> |
− | + | ::::''"Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."'' | |
#** Our scan: [https://logbooks.jlab.org/entry/3458624 before] and [https://logbooks.jlab.org/entry/3458635 after] Todd's script | #** Our scan: [https://logbooks.jlab.org/entry/3458624 before] and [https://logbooks.jlab.org/entry/3458635 after] Todd's script | ||
#** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator: | #** In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator: | ||
Line 18: | Line 18: | ||
#* Convergence studies from Hovanes: [https://logbooks.jlab.org/entry/3458654 Feb 15] vs [https://logbooks.jlab.org/entry/3458258 Feb 9] | #* Convergence studies from Hovanes: [https://logbooks.jlab.org/entry/3458654 Feb 15] vs [https://logbooks.jlab.org/entry/3458258 Feb 9] | ||
#** Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9) | #** Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9) | ||
− | + | ::::''"... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot."'' | |
# Hall-D/GlueX items | # Hall-D/GlueX items | ||
Line 26: | Line 26: | ||
#** [https://logbooks.jlab.org/entry/3458608 Restarting cMsg server] | #** [https://logbooks.jlab.org/entry/3458608 Restarting cMsg server] | ||
#** [https://logbooks.jlab.org/entry/3458714 Multiple instances of RootSpy on gluon47] | #** [https://logbooks.jlab.org/entry/3458714 Multiple instances of RootSpy on gluon47] | ||
− | + | ::::''"... no more than 1 or 2 instances running in the counting house at any point in time."'' | |
# Monitoring | # Monitoring | ||
# Run Plan | # Run Plan |
Revision as of 07:30, 16 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, February 16
- Accelerator Status
- "Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."
- "... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot."
- Hall-D/GlueX items
- A usual assortment of DAQ crashes
- RootSpy tips:
- "... no more than 1 or 2 instances running in the counting house at any point in time."
- Monitoring
- Run Plan
- Production data
- Hall safety walk-through is supposed to happen between 7:00 AM and 7:30 AM
- Offline Analysis?
- Any Other Business?