# Hall-D/GlueX items | # Hall-D/GlueX items | ||
#* Hall D access Wednesday 20 April. | #* Hall D access Wednesday 20 April. | ||
− | #** Access possible throughout | + | #** Access possible throughout Day and into Swing, starting as soon as we can get an ARM. |
#** RadCon has been contacted. Collimator cave access from 10 am or earlier. | #** RadCon has been contacted. Collimator cave access from 10 am or earlier. | ||
#** Collimator work | #** Collimator work |
Revision as of 11:53, 18 April 2016
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs
- Triggers
- Scheduled accelerator down on Wednesday 20 April.
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
- RadCon has been contacted. Collimator cave access from 10 am or earlier.
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Empty Target run with 5 mm hole
- TAGM alignment
- Latest Occupancy Plots
- Run Statistics
- Hall D access Wednesday 20 April.
- Run Plan
- Para/Perp luminosity studies?
- Trigger studies?
- Mode 8 (raw mode) running?
- Production 50 um
- Offline Analysis?
- Any Other Business?