Difference between revisions of "December 16, 2015 Calibration"
From GlueXWiki
(Created page with "GlueX Calibration Meeting<br> Wednesday, December 2, 2015<br> 11:00 am, EST<br> JLab: CEBAF Center, F326 ==Communication Information== ===Remote Connection=== <div class="t...") |
(→Agenda) |
||
Line 60: | Line 60: | ||
#** More validation needed. | #** More validation needed. | ||
# Subdetector Reports | # Subdetector Reports | ||
+ | # [[Sim1_Conditions|Future Simulations]] | ||
+ | # AOB | ||
+ | |||
+ | == Minutes == | ||
+ | |||
+ | Attending: Sean (NU); Curtis, Elton, Simon, Adesh, Mark I., Paul, Alex B., Nathan (JLab); Will M., Naomi (CMU); Mahmoud (FIU) | ||
+ | |||
+ | # Announcements | ||
+ | #* 12 GeV electron beam has been delivered to the tagger hall, and a photon beam has been extracted as well. This is a great step forward! | ||
+ | #** Nathan shared [https://logbooks.jlab.org/entry/3367883 a logbook entry] of the uncorrected PS energy spectrum. There was some discussion of this - the location of the high-energy cutoff is not understood. The measured beam energy reported by the accelerator was also found to be a little slow. | ||
+ | #* Data was taken to study the TAGH voltage settings. There was not much data, and it is not very useful for other calibrations since the RF signal needed was not hooked into the PSC. This has been fixed, and is being verified today. | ||
+ | #* Mark Ito reported that on Friday, he released sim-recon-1.8.0, which is included in version-1.1.1 of the XML version file. | ||
+ | #** The single track and b1pi tests have been updated with all the latest software. The single track is working fine. The b1pi seems to be working, except the jobs running on the same platform as the farm. This needs to be looked into. | ||
+ | #** Mark also reported a rumor that ifarm62 is disappearing, so we will no longer provide builds for CentOS 6.2. Most users have moved on from this platform. | ||
+ | #* Paul reported that the next monitoring launch will be Friday, and will be the last of the year. | ||
+ | # Calibration Tasks | ||
+ | #* [[Calibration_Challenge#Challenge_Type_1|Calibration Challenge]] update: | ||
+ | #** More validation needed. | ||
+ | # Subdetector Reports | ||
+ | |||
+ | #* Naomi reported that some changes she made to the fADC125 emulation code snuck into the main branch from a development branch, and reconstruction of mode 8 data has been broken since early November. Mode 7 data, which includes most of the Spring data being used for calibrations is unaffected. The issues is being tracked [https://github.com/JeffersonLab/sim-recon/issues/153 on GitHub here]. A fix is sitting on David L.'s desk to review, hopefully before the next monitoring launch occurs. | ||
# [[Sim1_Conditions|Future Simulations]] | # [[Sim1_Conditions|Future Simulations]] | ||
# AOB | # AOB |
Revision as of 13:41, 16 December 2015
GlueX Calibration Meeting
Wednesday, December 2, 2015
11:00 am, EST
JLab: CEBAF Center, F326
Contents
Communication Information
Remote Connection
You can connect using BlueJeans using the meeting number 630 804 895 . (Click "Expand" to the right for more details -->):
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- Meeting ID: 630804895
- (you may need to type this in, depending how you connect)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via iOS or Android App:
- Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
- Use *4 to unmute
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2015
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2015/ .
Calibration Tasks
- Summary of Detector Performance
- Update hit/reconstructed object variances in sim-recon
- Add plugins to sim-recon/src/plugins/Calibration
- Document calibration procedures
- Calibration Challenge
- Update Calibration Data Taking estimates
Agenda
- Announcements
- Calibration Tasks
- Calibration Challenge update:
- Current status: Code in as of Monday. Testing additions after farm maintenance on Tuesday.
- New additions: TAGM timewalk, FCAL gains & pedestals, PS energy calibration
- Documentation: RF Calibration, PSC TW Calibration, PS Energy Calibration, TAGM TW Calibration
- More validation needed.
- Calibration Challenge update:
- Subdetector Reports
- Future Simulations
- AOB
Minutes
Attending: Sean (NU); Curtis, Elton, Simon, Adesh, Mark I., Paul, Alex B., Nathan (JLab); Will M., Naomi (CMU); Mahmoud (FIU)
- Announcements
- 12 GeV electron beam has been delivered to the tagger hall, and a photon beam has been extracted as well. This is a great step forward!
- Nathan shared a logbook entry of the uncorrected PS energy spectrum. There was some discussion of this - the location of the high-energy cutoff is not understood. The measured beam energy reported by the accelerator was also found to be a little slow.
- Data was taken to study the TAGH voltage settings. There was not much data, and it is not very useful for other calibrations since the RF signal needed was not hooked into the PSC. This has been fixed, and is being verified today.
- Mark Ito reported that on Friday, he released sim-recon-1.8.0, which is included in version-1.1.1 of the XML version file.
- The single track and b1pi tests have been updated with all the latest software. The single track is working fine. The b1pi seems to be working, except the jobs running on the same platform as the farm. This needs to be looked into.
- Mark also reported a rumor that ifarm62 is disappearing, so we will no longer provide builds for CentOS 6.2. Most users have moved on from this platform.
- Paul reported that the next monitoring launch will be Friday, and will be the last of the year.
- 12 GeV electron beam has been delivered to the tagger hall, and a photon beam has been extracted as well. This is a great step forward!
- Calibration Tasks
- Calibration Challenge update:
- More validation needed.
- Calibration Challenge update:
- Subdetector Reports
- Naomi reported that some changes she made to the fADC125 emulation code snuck into the main branch from a development branch, and reconstruction of mode 8 data has been broken since early November. Mode 7 data, which includes most of the Spring data being used for calibrations is unaffected. The issues is being tracked on GitHub here. A fix is sitting on David L.'s desk to review, hopefully before the next monitoring launch occurs.
- Future Simulations
- AOB