(Created page with "* Modifications of config files :: - parameters for CAEN R-C adjustment :: - parameters for fa125 initialization :: - implementation of SYNC events (in progress) :: - configu...")
 
Line 3: Line 3:
 
:: - parameters for fa125 initialization  
 
:: - parameters for fa125 initialization  
 
:: - implementation of SYNC events (in progress)
 
:: - implementation of SYNC events (in progress)
:: - configuration of TPOL, concurrent runn
+
:: - configuration of TPOL, concurrent running with ST
 +
 
 +
* Other
 +
:: - new TS firmware version (check in progress)
 +
:: - BCAL LED trigger distribution through the TS (done)
 +
 
 +
  
  

Revision as of 10:01, 30 November 2015

  • Modifications of config files
- parameters for CAEN R-C adjustment
- parameters for fa125 initialization
- implementation of SYNC events (in progress)
- configuration of TPOL, concurrent running with ST
  • Other
- new TS firmware version (check in progress)
- BCAL LED trigger distribution through the TS (done)



  • New firmware for F1TDC
- update v3 firmware to the version v3_127
  • CAEN TDC multi-block readout
  • Scalers implementation at SYNC event
- asynchronous pedestals
  • L1 trigger commissioning plans for the fall run
- TAGM calibration (PS trigger)
- FDC alignment (ST/TOF + FCAL)
- FCAL/BCAL triggers (Energy sum)
- Trigger produced by TAGM/TAGH