Difference between revisions of "March 25, 2015 Calibration"
From GlueXWiki
(→Agenda) |
|||
Line 19: | Line 19: | ||
# Announcements | # Announcements | ||
# Subdetector Reports | # Subdetector Reports | ||
+ | # Detector Matching (Paul): [https://halldweb.jlab.org/cgi-bin/data_monitoring/monitoring/runBrowser.py?run_number=1516&ver=ver12 Run Browser] | ||
# Spring Calibration Plans | # Spring Calibration Plans | ||
# Simulations | # Simulations |
Revision as of 10:58, 25 March 2015
GlueX Calibration Meeting
Wednesday, March 25, 2015
11:00 am, EDT
JLab: CEBAF Center, F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 630804895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/630804895.
- To join via phone, use one of the following numbers and the Conference ID: 630804895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Subdetector Reports
- Detector Matching (Paul): Run Browser
- Spring Calibration Plans
- Simulations
- AOT
Proposed Spring Plans
- Short-term (few days)
- Realign detector times
- Compare detector performance to fall run
- Medium-term (~1-2 month)
- Check stability of existing calibrations
- Improve timing calibrations
- Continue TDC commissioning
- RF time calibration
- Refine timewalk, etc. corrections
- Monitor dependence on conditions (gas mix, temperature, etc.)
- Long-term (summer)
- Improve FCAL/BCAL calibrations
- Improve detector alignment
- Update digitization in simulation
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2015
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2015/ .