Difference between revisions of "BCAL Reconstruction Meeting 2015-01-22"
From GlueXWiki
(→Agenda) |
|||
Line 42: | Line 42: | ||
# Announcements | # Announcements | ||
# Action Items | # Action Items | ||
− | # | + | # Prioritize [[BCAL Reconstruction Issues]] |
# Commissioning | # Commissioning | ||
## Pedestal skims (Tegan) | ## Pedestal skims (Tegan) |
Revision as of 11:53, 22 January 2015
Contents
Video Conferencing Information
Meeting Time: 11:00 a.m. EDT
- To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
- To join via phone, use one of the following numbers and the Conference ID: 907185247.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Video-conference Suite is 306-585-4204
References
Action Items
- Feedback to Elton - GlueX-doc-2618 and GlueX-doc-2622 (All)
- 12 bit ADC - ask Sean Dobbs (Zisis)
- Elton's low-level coefficients into ccdb - ask Sean Dobbs (Zisis)
- Match with tracks - ask Paul, Simon (Zisis)
- Check new dark hits code after David's adjustments (Tegan)
- Shower curvature tables: compare KLOE to IU codes: check gap in cluster handling between codes (Tegan, Andrei)
- z-coordinate determination from up/down amplitude ratio (Tegan, Andrei)
- Cleanup: (Tegan, Will L.)
- Set variable “failures” to a number other than zero (e.g. -9999 or similar)
- Comb code for constants to be pulled out into a database
- Measure data pedestals using LV=0 setting (Mark)
- Sampling fraction tables (Tegan)
Agenda
- Announcements
- Action Items
- Prioritize BCAL Reconstruction Issues
- Commissioning
- Pedestal skims (Tegan)
- Calibration
- Simulations
- BDT effort (Tegan/Justin)
- Any other business
Minutes
Attendees: