Difference between revisions of "Photon Beam Polarimetry"
From GlueXWiki
(→Management/Safety) |
(→Management/Safety) |
||
Line 37: | Line 37: | ||
== Management/Safety == | == Management/Safety == | ||
* write proposal, safety concerns/procedures | * write proposal, safety concerns/procedures | ||
+ | ** [https://www.jlab.org/ehs/ehsmanual/3210T2.htm Link] to Task Hazard Analysis worksheet | ||
** example document for [http://www.public.asu.edu/~kmoriya/triplet/D00000-01-06-P006.docx FCAL dark room] (DOC) | ** example document for [http://www.public.asu.edu/~kmoriya/triplet/D00000-01-06-P006.docx FCAL dark room] (DOC) | ||
** [http://www.public.asu.edu/~kmoriya/triplet/D00000-10-05-P001%20Beamline%20Vacuum%20Procedures.pdf Hall D Beam Line Vacuum Procedures document] (PDF) | ** [http://www.public.asu.edu/~kmoriya/triplet/D00000-10-05-P001%20Beamline%20Vacuum%20Procedures.pdf Hall D Beam Line Vacuum Procedures document] (PDF) |
Revision as of 13:26, 9 January 2015
This page contains a list of to do items for installing the triplet polarimeter for the Spring 2015 GlueX run. Items that used to be on this page are now at the bottom in Items From Before January 2015
Contents
[hide]Expected Timeline
- February 2 - 5 (?): Kei visits ASU
- mid-February: ship triplet to JLab
- First week after delivery: Survey by JLab
- February 16 - March 27: installation
- March 28 - April 2: testing
- April 3 - May 4: physics beam
Hardware Division
- ASU
- motor (data sheet)
- controller
- power supply
- 4 channels of +12V, 0.21 amps per channel
- 4 channels of -12V, 0.21 amps per channel
- 1 channel of +200V, the leakage current on the silicon strip detecter is 3.3 micro-amps
- 32 short SSI cables with Lemo
- vacuum rated limit switches (data sheet)
- JLab
- fADCs
- 2 fADC250s on PSC VXS crate
- 32 coax cables with Lemos on both ends (Fernando). Require 55ft to racks
- turbo vacuum pump (Tim)
- fADCs
Things to do at ASU
- packaging, shipping
- testing(?)
Things to do at JLab
- preparation of hardware before shipment
- installation
- testing with source(?)
Management/Safety
- write proposal, safety concerns/procedures
- Link to Task Hazard Analysis worksheet
- example document for FCAL dark room (DOC)
- Hall D Beam Line Vacuum Procedures document (PDF)
- example document for FCAL Hazard Analysis (DOC)
- Get approval from Bert
- Pass by Patritzia
Analysis Procedures
- beam requirements
- requirements on other systems (PS, tagger)
- analysis procedure
- online monitoring
- MC (GEANT?)
Items From Before January 2015
- Studies of some direct photon polarimetry possibility for the meeting on November 1, 2010
- Azimuthal asymmetries from Geant4 polarized pair production on January 10, 2011
- triplet polarimeter presentation at May 2012 collaboration meeting
- July 6 2012 teleconference regarding triplet polarimeter
- Monte Carlo code