Difference between revisions of "BLTWG Meeting 09/15/2014"
From GlueXWiki
(→Organization) |
(→Agenda) |
||
Line 13: | Line 13: | ||
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.'' | # Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.'' | ||
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Richard J.'' | # [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Richard J.'' | ||
− | # Shift schedule review | + | # [http://www.jlab.org/Hall-D/shifts/ Shift schedule review] |
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.'' | # [[Beam Simulations|Tagger hall simulations]] - ''Richard J.'' | ||
# Tagger hall configuration during initial beam tune - ''discussion'' | # Tagger hall configuration during initial beam tune - ''discussion'' |
Revision as of 11:34, 15 September 2014
Organization
- Time: 11:30 EST, pre-meeting at 11:00 EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
- Present: Richard J., Alex B., Brendan P., James M., Natalie W., Franz K., Nathan S., and Todd S.
Agenda
- Announcements
- Collaboration Meeting
- Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
- Photon beam commissioning plan overview - Richard J.
- Shift schedule review
- Tagger hall simulations - Richard J.
- Tagger hall configuration during initial beam tune - discussion
- Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
- Report on tagger microscope setup and tests in ESB - James M, Alex B.
- Report on active collimator setup and tests - Alex B.
- Report on pair spectrometer setup and tests - Alex S.
- Pair spectrometer field stability study - Alexandre D.
- Report on diamond milling and mount construction - Brendan P
- Report on polarimeter construction - Michael D