Difference between revisions of "Photon Beam Commissioning Discussion July 16, 2014"
From GlueXWiki
(→References) |
(→Action Items) |
||
Line 15: | Line 15: | ||
== Action Items == | == Action Items == | ||
− | * Send link to accelerator commissioning procedure (Mike) | + | * <strike> Send link to accelerator commissioning procedure (Mike) </strike> |
* Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard) | * Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard) | ||
* Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd) | * Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd) |
Revision as of 15:03, 10 July 2014
Organization
- Time: 4 pm EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
References
Action Items
-
Send link to accelerator commissioning procedure (Mike) - Send Todd a geometry of tagger area, including the mapped tagger magnet field, for GEANT simulations (Richard)
- Todd will provide the magnetic field of the quadrupole immediately upstream of the tagger magnet (Todd)
- Check that radiator set for commissioning is available (Alexandre, Hovanes)
- Check that RadCon detectors are available/installed in tagger hall and hall D (Alexandre)
- Check that 'rapid access system' is being implemented in Hall D (Alexandre)
- Organize preparations for review (Elton).
Agenda
- Announcements
- Electron Commissioning (Todd/Mike)
- Photon Commissioning Draft (Eugene)
- Goals for Aug 8 Review
- Other business
Minutes
- Attending: