(Created page with "==DAQ== * Initial readout of pedestals (3 crates) * Install remaining CPUs * Readout FADC and F1 TDC crates ==Power MPPCs== * Connection to network * Connect chillers (power an...") |
|||
Line 4: | Line 4: | ||
* Readout FADC and F1 TDC crates | * Readout FADC and F1 TDC crates | ||
− | == | + | |
− | * | + | ==Chiller== |
− | * | + | * Make connections from chiller to manifold ring |
− | * Install | + | * Get power connections to chiller |
+ | * Check operation of cooling loop | ||
+ | |||
+ | ==N2 flow== | ||
+ | * Install flow meters symmetrically on upstream and downstream | ||
==Slow Controls== | ==Slow Controls== | ||
Line 14: | Line 18: | ||
* Read back of RTDs on cooling plates upstream | * Read back of RTDs on cooling plates upstream | ||
* Read back of RTDs on cooling plates downstream | * Read back of RTDs on cooling plates downstream | ||
− | * Install interlock of chiller and MPPC power to humidity and temperature signals | + | * Install interlock of chiller and MPPC power to humidity and temperature signals (long term). For now manual check. |
+ | |||
+ | ==Set Power MPPCs== | ||
+ | * Connection to network | ||
+ | * Check that data base has correct bias information | ||
==LED monitoring== | ==LED monitoring== |
Revision as of 09:19, 13 February 2014
DAQ
- Initial readout of pedestals (3 crates)
- Install remaining CPUs
- Readout FADC and F1 TDC crates
Chiller
- Make connections from chiller to manifold ring
- Get power connections to chiller
- Check operation of cooling loop
N2 flow
- Install flow meters symmetrically on upstream and downstream
Slow Controls
- Read back T and Humidity upstream
- Read back T and Humidity downstream
- Read back of RTDs on cooling plates upstream
- Read back of RTDs on cooling plates downstream
- Install interlock of chiller and MPPC power to humidity and temperature signals (long term). For now manual check.
Set Power MPPCs
- Connection to network
- Check that data base has correct bias information
LED monitoring
- Replace translation boards with correct assignment
- Install MOD crate
- Complete cabling to crate
- Connect MPOD and VME crates to network