Difference between revisions of "Controls Meeting 6-Feb-2014"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 3: | Line 3: | ||
* Announcements | * Announcements | ||
* Minutes from previous meeting [[Controls Meeting 23-Jan-2014]] | * Minutes from previous meeting [[Controls Meeting 23-Jan-2014]] | ||
− | * Scope of these | + | * Scope of these meetings (All) |
* UPS requirements for controls in Hall D (Dave, Yi, Hovanes) | * UPS requirements for controls in Hall D (Dave, Yi, Hovanes) | ||
− | * Status of interlocks for BCAL and FDC power supplies (Dave | + | * Status of interlocks for BCAL and FDC power supplies (Dave) |
* GlueX collaboration meeting (Hovanes) | * GlueX collaboration meeting (Hovanes) | ||
Revision as of 15:56, 5 February 2014
Agenda
- Announcements
- Minutes from previous meeting Controls Meeting 23-Jan-2014
- Scope of these meetings (All)
- UPS requirements for controls in Hall D (Dave, Yi, Hovanes)
- Status of interlocks for BCAL and FDC power supplies (Dave)
- GlueX collaboration meeting (Hovanes)
Time/Location
9:30AM Thurs 6-Feb-2014 CC A110