Difference between revisions of "2013-11-13"
From GlueXWiki
(→Reports from Technical Groups) |
(→Reports from Technical Groups) |
||
Line 38: | Line 38: | ||
** FDC | ** FDC | ||
* PID | * PID | ||
− | ** TOF [[GlueX TOF Meeting, November | + | ** TOF [[GlueX TOF Meeting, November 07, 2013|November 07, 2013]] |
** Start Counter [[GlueX Start Counter Meeting, October 17, 2013#Minutes|October 17, 2013]] | ** Start Counter [[GlueX Start Counter Meeting, October 17, 2013#Minutes|October 17, 2013]] | ||
** PID Upgrades [[November 1, 2013 PID Upgrade|November 1, 2013]] | ** PID Upgrades [[November 1, 2013 PID Upgrade|November 1, 2013]] | ||
Line 54: | Line 54: | ||
* Offline Software | * Offline Software | ||
** Offline [[GlueX Offline Meeting, October 30, 2013|October 30, 2013]] | ** Offline [[GlueX Offline Meeting, October 30, 2013|October 30, 2013]] | ||
− | ** Calibration [[November 6, 2013 Tracking CDC/FDC|November 6, 2013 | + | ** Calibration [[November 6, 2013 Tracking CDC/FDC|November 6, 2013]] |
** Software Review Planning | ** Software Review Planning | ||
* Photon Beam and Tagger [[BLTWG Meeting 11/11/2013|November 11, 2013]] | * Photon Beam and Tagger [[BLTWG Meeting 11/11/2013|November 11, 2013]] | ||
* Physics [[November 4, 2013, Physics Working Group|November 4, 2013]] | * Physics [[November 4, 2013, Physics Working Group|November 4, 2013]] |
Revision as of 15:19, 12 November 2013
Contents
Meeting Time and Place
The meeting will be on Wednesday November 13, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
MOU and Contract Status
- Contracts
- UConn (Diamond)
Reports from Technical Groups
- Calorimeters:
- Calorimetry November 5, 2013
- BCAL Reconstruction November 12, 2013
- Tracking November 6, 2013
- CDC --- transport to Jefferson Lab on October 29.
- FDC
- PID
- TOF November 07, 2013
- Start Counter October 17, 2013
- PID Upgrades November 1, 2013
- Calibration
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation November 8, 2013 Installation
- Electronics
- Trigger
- Hardware (Level-1) November 6, 2013
- Software (Level-3) October 15, 2013
- DAQ/Monitoring/Controls November 6, 2013
- Offline Software
- Offline October 30, 2013
- Calibration November 6, 2013
- Software Review Planning
- Photon Beam and Tagger November 11, 2013
- Physics November 4, 2013