== Installation == | == Installation == | ||
− | - The results from the survey of the FDC on the floor in the Hall are attached (still preliminary). The main conclusions: flatness of all the packages is OK (max deviation | + | - The results from the survey of the FDC on the floor in the Hall are attached (still preliminary). The main conclusions: flatness of all the packages is OK (max deviation from the best fitted plane is 0.022"=0.56 mm). The centering of all the packages is perfect. The main concern is that the tilt (pitch and yaw) of the packages changed if compared to the Blue Crab measurements. |
== Engineering == | == Engineering == |
Revision as of 16:30, 31 October 2013
October 31, 2013 FDC meeting
Agenda
- Installation [1]
- FDC survey and rail alignment (Tim, Bill)Survey results_1, Survey results_2
- Engineering (Bill)
- Electronics (Chris, Nick)
- Tests in EEL126 FDC E-log (Beni)
- New F1TDC
- Other