Line 17: | Line 17: | ||
#Locate mooring snubbers | #Locate mooring snubbers | ||
#Rent a truck | #Rent a truck | ||
− | ##Need to measure temp near CDC - | + | ##Need to measure temp near CDC - use long thermocouple |
#Update packing list - extra things to bring (HVBs, manifold etc) [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2141 installation doc with packing list] | #Update packing list - extra things to bring (HVBs, manifold etc) [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2141 installation doc with packing list] | ||
#Book accommodation at resfac | #Book accommodation at resfac | ||
Line 38: | Line 38: | ||
<h3>Shopping list</h3> | <h3>Shopping list</h3> | ||
− | #Truck | + | #Truck - have a candidate |
− | #Unistrut & fittings to modify cart | + | #Unistrut & fittings to modify cart - on order |
− | #Swivel wheels | + | #Swivel wheels - on order |
− | #Bubble wrap | + | #Bubble wrap - on order |
− | #Filters for gas lines | + | #Filters for gas lines |
− | #Thermocouple | + | #Thermocouple - done |
+ | #Fan to distrib heat - on order | ||
#Do we need to borrow a mini-compressor for the cart tires? | #Do we need to borrow a mini-compressor for the cart tires? |
Revision as of 11:57, 8 October 2013
Contents
Overview
- Load up at CMU - looking at Oct 28-30 or Nov 4-6
- Ideally, store truck indoors overnight
- Drive to JLab
- Arrival before ?pm - go to EEL to unload
- Arrival after ? pm - go to Hall D, drive in, CDC in truck overnight, drive to EEL the next day and unload
Preparations
- Shopping list below
- Add reinforcements to CDC cart for forklift
- Calculate position of CDC's CM - Naomi - approx 20" from Al plate, will revise
- Swap straight wheels for swivel wheels
- Find filters to cap CDC gas tubes
- Wrap CDC in bubblewrap
- Cut dual-density foam to size
- Locate mooring snubbers
- Rent a truck
- Need to measure temp near CDC - use long thermocouple
- Update packing list - extra things to bring (HVBs, manifold etc) installation doc with packing list
- Book accommodation at resfac
- Find somewhere to keep truck indoors overnight at CMU - Naomi
- Negotiate loading bay access - Curtis
- Arrange time with fork lift driver - Gary
Equipment for readout
- 4 long scint paddles are to travel down from CMU
- Do we need to bring any NIM modules?
Longer term plans - after arrival at JLab
- CDC is to be stored in EEL 126? until FDC installation is complete
- HV blocks need to be added
- CDC mini-readout in EEL can be set up once FDC has moved into Hall D
- Expect CDC installation to be in Jan 2014 (engineering) or Dec 2013 (electronics) schedules are linked to installation meeting Sept 27
Shopping list
- Truck - have a candidate
- Unistrut & fittings to modify cart - on order
- Swivel wheels - on order
- Bubble wrap - on order
- Filters for gas lines
- Thermocouple - done
- Fan to distrib heat - on order
- Do we need to borrow a mini-compressor for the cart tires?