Difference between revisions of "CDC travel plans"
From GlueXWiki
Line 7: | Line 7: | ||
− | <h3>Preparations</h3> | + | <h3>Preparations</h3> |
+ | #Shopping list below | ||
#Add reinforcements to CDC cart for forklift | #Add reinforcements to CDC cart for forklift | ||
− | |||
##Calculate position of CDC's CM - Naomi - approx 20" from Al plate, will revise | ##Calculate position of CDC's CM - Naomi - approx 20" from Al plate, will revise | ||
#Swap straight wheels for swivel wheels | #Swap straight wheels for swivel wheels | ||
− | |||
#Find filters to cap CDC gas tubes | #Find filters to cap CDC gas tubes | ||
− | #Wrap CDC in bubblewrap | + | #Wrap CDC in bubblewrap |
− | + | ||
#Cut dual-density foam to size | #Cut dual-density foam to size | ||
#Locate mooring snubbers | #Locate mooring snubbers | ||
Line 40: | Line 38: | ||
<h3>Shopping list</h3> | <h3>Shopping list</h3> | ||
+ | #Truck | ||
#Unistrut & fittings to modify cart | #Unistrut & fittings to modify cart | ||
#Swivel wheels | #Swivel wheels | ||
#Bubble wrap | #Bubble wrap | ||
− | # | + | #Filters for gas lines |
#Thermocouple? | #Thermocouple? | ||
#Do we need to borrow a mini-compressor for the cart tires? | #Do we need to borrow a mini-compressor for the cart tires? |
Revision as of 11:06, 8 October 2013
Contents
Overview
- Load up at CMU - looking at Oct 28-30 or Nov 4-6
- Ideally, store truck indoors overnight
- Drive to JLab
- Arrival before ?pm - go to EEL to unload
- Arrival after ? pm - go to Hall D, drive in, CDC in truck overnight, drive to EEL the next day and unload
Preparations
- Shopping list below
- Add reinforcements to CDC cart for forklift
- Calculate position of CDC's CM - Naomi - approx 20" from Al plate, will revise
- Swap straight wheels for swivel wheels
- Find filters to cap CDC gas tubes
- Wrap CDC in bubblewrap
- Cut dual-density foam to size
- Locate mooring snubbers
- Rent a truck
- Need to measure temp near CDC - buy long thermocouple?
- Update packing list - extra things to bring (HVBs, manifold etc) installation doc with packing list
- Book accommodation at resfac
- Find somewhere to keep truck indoors overnight at CMU - Naomi
- Negotiate loading bay access - Curtis
- Arrange time with fork lift driver - Gary
Equipment for readout
- 4 long scint paddles are to travel down from CMU
- Do we need to bring any NIM modules?
Longer term plans - after arrival at JLab
- CDC is to be stored in EEL 126? until FDC installation is complete
- HV blocks need to be added
- CDC mini-readout in EEL can be set up once FDC has moved into Hall D
- Expect CDC installation to be in Jan 2014 (engineering) or Dec 2013 (electronics) schedules are linked to installation meeting Sept 27
Shopping list
- Truck
- Unistrut & fittings to modify cart
- Swivel wheels
- Bubble wrap
- Filters for gas lines
- Thermocouple?
- Do we need to borrow a mini-compressor for the cart tires?