Difference between revisions of "Sep 24, 2013 Calorimetry"
From GlueXWiki
(→Items for followup from previous meeting(s)) |
(→Tentative Agenda) |
||
Line 28: | Line 28: | ||
# Monitoring | # Monitoring | ||
# FCAL | # FCAL | ||
− | |||
# BCAL | # BCAL | ||
+ | #* Moved BCAL into solenoid! | ||
+ | #* Photos [http://gluex.phys.uregina.ca/content/photo/downstream-view-bcal-after-installation Downstream View], [http://gluex.phys.uregina.ca/content/photo/upstream-view-bcal-after-installation Upstream View], [http://gluex.phys.uregina.ca/content/photo/closeup-upstream-view-bcal-after-installation-four-support-strips-are-visible Closeup Upstream View] | ||
+ | #* Removed readout assemblies from both sides of six modules (33-37 and 41) for inspection | ||
+ | #* All electronics dry. No visible damage | ||
+ | #* Assemblies on the rail pads very tight. Need to remove inside plate on some in order to take them off. This should be standard procedure. | ||
+ | #* Downstream no visible anomalies. Upstream, boundary between module 41 and 40 showed a thicker dark band at interface (about 1-2 fibers instead of 0.5-1), but did not appear to be due to insertion of the module. Seems consistent with Regina archival photo "End 2 Image". | ||
# Reconstruction and Simulation | # Reconstruction and Simulation | ||
# TDR update | # TDR update |
Revision as of 15:27, 17 September 2013
'Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Revisit raw data format for Flash-250 MHz following Flash-125 MHz discussion. (all)
- Upload documentation for interlocks and monitoring to Doc Db (Dan)
- Check that latest edits of TDR have been checked into svn (Zisis)
Tentative Agenda
- Announcements
- October Collaboration Meeting
- Action Items
- Monitoring
- FCAL
- BCAL
- Moved BCAL into solenoid!
- Photos Downstream View, Upstream View, Closeup Upstream View
- Removed readout assemblies from both sides of six modules (33-37 and 41) for inspection
- All electronics dry. No visible damage
- Assemblies on the rail pads very tight. Need to remove inside plate on some in order to take them off. This should be standard procedure.
- Downstream no visible anomalies. Upstream, boundary between module 41 and 40 showed a thicker dark band at interface (about 1-2 fibers instead of 0.5-1), but did not appear to be due to insertion of the module. Seems consistent with Regina archival photo "End 2 Image".
- Reconstruction and Simulation
- TDR update
- Calibration of Calorimeters
- Any other business
Minutes
Attendees: