Difference between revisions of "BCAL Reconstruction Meeting 2013-09-03"
From GlueXWiki
Line 35: | Line 35: | ||
== Action Items == | == Action Items == | ||
− | + | * Will will move some items from wiki page into Mantis | |
− | + | ||
− | + | * Dave will remove "BCAL Reconstruction Algorithms" from Action Item list | |
+ | |||
+ | * Will checked this and saw that yes, we did see more cluster in the outer layers, but this is due to a combination of 1. greater noise due to more summed channels 2. poorer timing resolution and 3. "curvature" of the shower. | ||
+ | |||
+ | * Dave needs to check BCAL calibration constant status (prepare slides for collaboration meeting of full data flow) | ||
+ | |||
== Updates == | == Updates == | ||
== Discuss and prioritize the Reconstruction Issues and produce a timetable for the work == | == Discuss and prioritize the Reconstruction Issues and produce a timetable for the work == | ||
== Any other business == | == Any other business == |
Revision as of 11:30, 3 September 2013
Teleconference Time: 11:15 a.m. EDT
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Video-conference Suite is 306-585-4204
Action Items
- BCAL Reconstruction Issues
- BCAL Reconstruction Algorithms
- Will to check whether second cluster appears mostly in the outer layers, due to the "curving" of the shower.
- Introduce FPGA timing algorithm to derive hit times from fADC
- Gather reconstruction conditions for outer layers on the Wiki.
Agenda
- Action Items
- Updates
- Discuss and prioritize the Reconstruction Issues and produce a timetable for the work.
- Any other business
Minutes
Attendees: David L., George V., Zisis P., Will L.
Action Items
- Will will move some items from wiki page into Mantis
- Dave will remove "BCAL Reconstruction Algorithms" from Action Item list
- Will checked this and saw that yes, we did see more cluster in the outer layers, but this is due to a combination of 1. greater noise due to more summed channels 2. poorer timing resolution and 3. "curvature" of the shower.
- Dave needs to check BCAL calibration constant status (prepare slides for collaboration meeting of full data flow)