Difference between revisions of "Minutes-4-18-2013"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 6: Line 6:
 
# Installation (Lubomir, Bill)
 
# Installation (Lubomir, Bill)
 
#* FDC installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf document]
 
#* FDC installation [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_installation.pdf document]
#* Plans for practicing at Blue Crab  
+
#* Practicing at Blue Crab  
 
# Engineering (Bill)
 
# Engineering (Bill)
 
#* Cooling system tests
 
#* Cooling system tests
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)
# Tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log]
+
# Full electronics tests at EEL126 [https://halldweb1.jlab.org/elog-halld/FDC FDC E-log]
 
# Other
 
# Other
  

Revision as of 17:59, 17 April 2013

April 18, 2013 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Third package status
  2. Installation (Lubomir, Bill)
    • FDC installation document
    • Practicing at Blue Crab
  3. Engineering (Bill)
    • Cooling system tests
  4. Electronics (Chris, Nick)
  5. Full electronics tests at EEL126 FDC E-log
  6. Other