Difference between revisions of "BLTWG Meeting 04/15/2013"
From GlueXWiki
(→Agenda) |
|||
Line 10: | Line 10: | ||
# Report on construction of the PS detectors - ''Sascha'' | # Report on construction of the PS detectors - ''Sascha'' | ||
# Report from accelerator liaison - ''Todd'' | # Report from accelerator liaison - ''Todd'' | ||
− | |||
# Report on the fixed array construction - ''Franz'' | # Report on the fixed array construction - ''Franz'' | ||
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout] | #* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout] | ||
#* [[fixed array: design]] | #* [[fixed array: design]] | ||
+ | # [https://halldweb1.jlab.org/manuals/HallD_Hodoscope.pttx Base/Amplifier for fixed-array PMT] - ''Vladimir'' | ||
# Report on the microscope construction - ''James'' | # Report on the microscope construction - ''James'' | ||
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule] | #* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule] |
Revision as of 11:32, 15 April 2013
Organization
- Time: 11:30 EST
- Place: ESNET and Seevogh (Jlab community)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- Report on construction of the PS detectors - Sascha
- Report from accelerator liaison - Todd
- Report on the fixed array construction - Franz
- Base/Amplifier for fixed-array PMT - Vladimir
- Report on the microscope construction - James
- Status of the microscope electronics construction - Alex
- Update on polarimetry - Mike
- Discussion of installation issues - James
- Draft of tagger magnet mapping plan - Dan
- any other business