Difference between revisions of "Minutes-4-4-2013"
From GlueXWiki
Line 5: | Line 5: | ||
#* Package #3 repair | #* Package #3 repair | ||
# Installation (Lubomir, Bill) | # Installation (Lubomir, Bill) | ||
− | #* Cable installation: | + | #* Cable installation: Rich's models [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC-CDC_WIRE_PRE-INSTALLED.pdf], [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_WIRE_FDC_OFF_CART.pdf], [http://www.jlab.org/Hall-D/detector/fdc/installation/FDC_WIRE_INSTALLED.pdf] |
#* Plans for practicing at Blue Crab | #* Plans for practicing at Blue Crab | ||
# Engineering (Bill) | # Engineering (Bill) |
Revision as of 11:29, 4 April 2013
April 4, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Package #3 repair
- Installation (Lubomir, Bill)
- Engineering (Bill)
- Cooling system status
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other