Difference between revisions of "Minutes-3-14-2013"
From GlueXWiki
Line 4: | Line 4: | ||
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_March_14_2013.xlsx Construction Tracking] (Dave) | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_March_14_2013.xlsx Construction Tracking] (Dave) | ||
#* Spare parts | #* Spare parts | ||
− | #* Package #3 repair | + | #* Package #3 repair [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0298.JPG cathode foil discoloration], [http://www.jlab.org/Hall-D/detector/fdc/photographs/IMG_0295.JPG] |
# Installation [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install.jpg schedule (last week)], [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install3.jpg schedule (this week)](Lubomir) | # Installation [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install.jpg schedule (last week)], [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install3.jpg schedule (this week)](Lubomir) | ||
# Engineering (Bill) | # Engineering (Bill) |
Revision as of 17:47, 14 March 2013
March 14, 2013 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Spare parts
- Package #3 repair cathode foil discoloration, [1]
- Installation schedule (last week), schedule (this week)(Lubomir)
- Engineering (Bill)
- Manifold installation first pair isntalled
- Electronics (Chris, Nick)
- Tests at EEL126 FDC E-log (Beni)
- Other