Difference between revisions of "Dec 5, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Action Items from previous meetings)
(Action Items from previous meetings)
Line 1: Line 1:
 
== Action Items from previous meetings ==
 
== Action Items from previous meetings ==
  
# <strike> Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) </strke,> Decided to  have a separate patch panel, which allows decisions on these other items to a later date
+
# <strike> Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) </strike> Decided to  have a separate patch panel, which allows decisions on these other items to a later date
# <strike> Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim) </strke>
+
# <strike> Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim) </strike>
 
# <strike> Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi) </strike>
 
# <strike> Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi) </strike>
 
# <strike> Determine granularity of LED bias and power, as well as multiplicity of trigger signals (Elton) </strike>
 
# <strike> Determine granularity of LED bias and power, as well as multiplicity of trigger signals (Elton) </strike>

Revision as of 17:08, 6 December 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando) Decided to have a separate patch panel, which allows decisions on these other items to a later date
  2. Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim)
  3. Give Jim a U-board with defective SiPM for devising extraction tool (Nick and Yi)
  4. Determine granularity of LED bias and power, as well as multiplicity of trigger signals (Elton)
  5. Check on official releases of the 3D model (Elton and Jim) All items will have a drawing. 3D models will be tagged in directories on the group disk.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule for production and testing (all)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: