Difference between revisions of "GlueX Offline Meeting, November 28, 2012"
(→Data Challenge Ststus) |
(→Announcements) |
||
Line 42: | Line 42: | ||
* We decided to set January 1, 2013 as the cut-off date for calibration constant changes to the file-based system, stored in the Subversion repository. After that changes will have to be entered into the calibration database (CCDB). | * We decided to set January 1, 2013 as the cut-off date for calibration constant changes to the file-based system, stored in the Subversion repository. After that changes will have to be entered into the calibration database (CCDB). | ||
− | + | * To get to the computers in the counting house via ssh, you must first log into a gateway node hallgw.jlab.org. You will need a two-factor authentication token to do that. | |
− | + | * There is a plan to use an EVIO dat source and read it into Jana via an ET ring on the node in the counting house. There is also a plan to add farm management to the system. | |
− | computers in counting house | + | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
==Review of Minutes from Last Meeting== | ==Review of Minutes from Last Meeting== |
Revision as of 18:26, 28 November 2012
GlueX Offline Software Meeting
Wednesday, November 28, 2012
1:30 pm EST
JLab: ARC 428
Contents
Agenda
- Announcements
- Review of minutes from the last meeting: all
- Reconstruction sub-group reports
- Calorimeters
- Tracking
- PID
- Data Challenge Status
- Report from the last Data Challenge Meeting
- Details of the configuration
- Action Item Review
- Review of recent repository activity: all
Communication Information
Video Conferencing
- ESNet: 8542553
- EVO:
- Direct Meeting Link
- Phone Bridge ID: 13 0949
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-4Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-4Q/ .
Minutes
Present:
- CMU: Paul Mattione, Curtis Meyer
- JLab: Mark Ito (chair), David Lawrence, Dmitry Romanov, Sascha Somov, Simon Taylor, Elliott Wolin
Announcements
- We decided to set January 1, 2013 as the cut-off date for calibration constant changes to the file-based system, stored in the Subversion repository. After that changes will have to be entered into the calibration database (CCDB).
- To get to the computers in the counting house via ssh, you must first log into a gateway node hallgw.jlab.org. You will need a two-factor authentication token to do that.
- There is a plan to use an EVIO dat source and read it into Jana via an ET ring on the node in the counting house. There is also a plan to add farm management to the system.
Review of Minutes from Last Meeting
Tracking Report
tracking, propagating covarianve matrix along trajectory cdc geometry broken, in process of fixing bcal geometry, readout box masking some of the material
comments about conceptual subtleties
Data Challenge Ststus
ask for cpus on farm, submitr jobs by this afternoon make a tagged release
Geometry Query Tool
geometry, look at geometry, charged pion polarizability, differnt target locations, iefficiency when target moved back material tool for locating space point within the geometry
ROOT-based Event Display
started working on EVE