Difference between revisions of "2012-11-14"
From GlueXWiki
(→Reports from Technical Groups) |
(→Reports from Technical Groups) |
||
Line 53: | Line 53: | ||
** TOF [[GlueX TOF Meeting, October 25, 2012|October 25, 2012]] | ** TOF [[GlueX TOF Meeting, October 25, 2012|October 25, 2012]] | ||
** Start Counter [[GlueX Start Counter Meeting, October 18, 2012#Minutes|October 18, 2012]] | ** Start Counter [[GlueX Start Counter Meeting, October 18, 2012#Minutes|October 18, 2012]] | ||
− | ** PID Upgrades [[November | + | ** PID Upgrades [[November 9, 2012 PID Upgrade|November 9, 2012]] |
* Engineering | * Engineering | ||
** Magnet | ** Magnet |
Revision as of 15:03, 13 November 2012
Contents
Meeting Time and Place
The meeting will be on Wednesday November 14, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 103736. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
Announcements
- Monthly Installation Meetings will start on Monday November 12.
- Software Review Follow-up postponed.
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Construction Contracts
- CUA
- FIU
- UCONN
Technical Design Report
- TDR Editor in progress....
Reports from Technical Groups
- Calorimeters
- Calorimetry October 23, 2012
- BCAL Readout November 13, 2012
- Tracking October 24, 2012
- CDC
- FDC
- PID
- TOF October 25, 2012
- Start Counter October 18, 2012
- PID Upgrades November 9, 2012
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation November 12, 2012 Installation
- Electronics
- Technical Design Report
- Trigger November 7, 2012
- DAQ/Monitoring/Controls November 7, 2012
- Offline
- Software Meeting October 31, 2012
- Data Challenge November 5, 2012
- Photon Beam and Tagger November 12, 2012
- Physics November 5, 2012