Difference between revisions of "Minutes-10-25-2012"
From GlueXWiki
(Created page with "October 25, 2012 FDC meeting = Agenda = # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_October_25_2012.xlsx Construction Tracking] (Dave) # Co...") |
|||
Line 13: | Line 13: | ||
= Minutes = | = Minutes = | ||
− | Participants: Eugene, Bill, Dave, Chris, Nick, Vlad, Simon | + | Participants: Eugene, Bill, Dave, Chris, Nick, Vlad, Simon, and Lubomir. |
== Production == | == Production == | ||
− | - Dave | + | - Dave deadened wire plane #29. Casey and Tina may come this Saturday to string wire plane #30. Will have the gas on Monday, hopefully by the end of the week will start testing the first package. Anatoly is refurbishing the cathodes for package #2. He removed the foil on four cathodes and started the fifth. We decided to stop with the refurbishment, before we are sure we have the foils. The foils are supposed to be end of November. Bill: do we need first article to check if there are problems. Since this is the same company (Allflex) they now how to do them and what do we need. We didn't have problems with the foils before, Anatoly tested all of them strip by strip. Initially there was some discoloration |
- Vlad started applying HV on the new cells: could not reach more than ~1800V on two of the new cells. We suspect that the limitation comes from the gas, Nitrogen. We will try the same on a cell that worked before. | - Vlad started applying HV on the new cells: could not reach more than ~1800V on two of the new cells. We suspect that the limitation comes from the gas, Nitrogen. We will try the same on a cell that worked before. |
Revision as of 18:24, 25 October 2012
October 25, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Corrosion tests (Vlad)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Third package tests FDC E-log (Lubomir)
- Other