# Provide feedback to Fernando on his readout assembly schedule (Elton and Jim)
 
# Provide feedback to Fernando on his readout assembly schedule (Elton and Jim)
 
# Check uniformity of LED source in black testing box
 
# Check uniformity of LED source in black testing box
 +
# Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 17:55, 20 September 2012

Action Items from previous meetings

  1. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
  2. Work with Shaun to write up a procedure for substituting a sensor on one of the boards to be assembled. (Jack)
  3. Provide feedback to Fernando on his readout assembly schedule (Elton and Jim)
  4. Check uniformity of LED source in black testing box
  5. Make a metal die to punch holes in cooling mat to ease assembly. (Nick and Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. mini-Bcal (Elton)
  5. SiPM production testing (Yi)
  6. Mechanical assembly (Jim)
  7. Temperature compensation (Jack)
  8. Electronic boards (Fernando and Chris)
  9. Light guide gluing setup (Scot)

Minutes

Attending: