Difference between revisions of "BLTWG Meeting 07/23/2012"
From GlueXWiki
m |
|||
Line 9: | Line 9: | ||
# Requirements for low current operation -- ''discussion'' | # Requirements for low current operation -- ''discussion'' | ||
# Visual monitoring of the radiator -- ''Yi'' | # Visual monitoring of the radiator -- ''Yi'' | ||
+ | #* [http://www.flir.com/thermography/americas/us/view/?id=56911&collectionid=664&col=50850 FLIR E-Series] | ||
# [http://argus.phys.uregina.ca/gluex/DocDB/0020/002034/001/HallD_mapping.ppt Beginnings of a plan for mapping the tagger magnet] -- ''Dan'' | # [http://argus.phys.uregina.ca/gluex/DocDB/0020/002034/001/HallD_mapping.ppt Beginnings of a plan for mapping the tagger magnet] -- ''Dan'' | ||
# The fixed tagger array geometry -- ''Dan'' | # The fixed tagger array geometry -- ''Dan'' |
Revision as of 11:42, 23 July 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 561 3418)
- Connecting: instructions are here
- Present: Alex S., Yi Q., Tim W., Curtis M., Richard J., Igor S., Alex B., Fridah M., and James M.
Agenda
- Announcements
- Progress on UConn construction contract -- Richard
- Requirements for low current operation -- discussion
- Visual monitoring of the radiator -- Yi
- Beginnings of a plan for mapping the tagger magnet -- Dan
- The fixed tagger array geometry -- Dan
- Report from Glasgow group -- Ken
- Report from ASU group -- Mike
- Update on diamond thinning from SINMAT -- Richard
- Update on microscope construction -- James
- possible loan of DAq system with FADC to UConn
- possible swap of two SIPM's with Jlab (soon??)