# Mechanical Design | # Mechanical Design | ||
# Read-out Design | # Read-out Design | ||
− | |||
− | |||
# Simulation: [[Start Counter Background Studies]] | # Simulation: [[Start Counter Background Studies]] | ||
# Contract | # Contract | ||
Line 45: | Line 43: | ||
preliminary drawings will be produced by chuck so mcneal can make the correct shape | preliminary drawings will be produced by chuck so mcneal can make the correct shape | ||
+ | |||
+ | {| | ||
+ | |- | ||
+ | | [[File:sc_prototype_board.jpg|thumb|read-out board]] | ||
+ | | [[File:sc_prototype_cable.jpg|thumb|read-out board with cables]] | ||
+ | |} | ||
still checks on simulation, will meet with Sasha | still checks on simulation, will meet with Sasha |
Revision as of 16:32, 12 July 2012
GlueX Start Counter Meeting
Thursday, July 12, 2012
10 am EDT
JLab: CEBAF Center F326/327
Agenda
- Announcements
- Review minutes from previous meeting
- Mechanical Design
- Read-out Design
- Simulation: Start Counter Background Studies
- Contract
Communication Information
Video Conferencing
- ESNet: 8542553
- EVO:
- Direct meeting link
- Phone Bridge ID: 13 2615
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .
Minutes
Start Counter Meeting Notes
mark, tim puneet, chuck, eugene, beni lei
76 mm 3mm 600 mm wide piece of scintillatoer, 5 pieces ordered form elgen
mechanical holding finalize foam, buy made
preliminary drawings will be produced by chuck so mcneal can make the correct shape
still checks on simulation, will meet with Sasha
different optical properties for different edges of scintillator, edge surface quality not as good strategy from g4 workshop
contract app, must go faster