Difference between revisions of "Minutes-6-28-2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "June 28, 2012 FDC meeting = Agenda = # [http://www.jlab.org/Hall-D/detector/fdc/drawings/CABLE_ROUTING_INSTALLATION.pptx FDC installation and cable routing] (Tom Carstens) # Pro...")
 
(Agenda)
Line 5: Line 5:
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Jun_21_2012.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Jun_21_2012.xlsx Construction Tracking] (Dave)
 
#* Production status
 
#* Production status
#*  
+
#* Other: package transportation, subsystem installations
 
# Engineering update
 
# Engineering update
 
#* Cooling system  
 
#* Cooling system  

Revision as of 16:10, 27 June 2012

June 28, 2012 FDC meeting

Agenda

  1. FDC installation and cable routing (Tom Carstens)
  2. Production Construction Tracking (Dave)
    • Production status
    • Other: package transportation, subsystem installations
  3. Engineering update
    • Cooling system
  4. Electronics update (Chris)
  5. Cable assignment (Vlad)
  6. Gas system (Beni)
  7. Test set-up in 126 (Beni)
    • Cathode tests of the first package (Vlad)
  8. Other