Difference between revisions of "Mini FCAL Meeting Mon. Mar. 05, 2012"
From GlueXWiki
Line 11: | Line 11: | ||
Note that the code does not track optical photons, only energetic gamma rays. | Note that the code does not track optical photons, only energetic gamma rays. | ||
− | *[https://halldweb1.jlab.org/wiki/images/a/ab/0. | + | *[https://halldweb1.jlab.org/wiki/images/a/ab/0.200GeV_overview.pdf Simulation overview at 0.2GeV] |
− | *[https://halldweb1.jlab.org/wiki/images/9/9a/0. | + | *[https://halldweb1.jlab.org/wiki/images/9/9a/0.200GeV_detector.pdf Detector response at 0.2GeV] |
− | *[https://halldweb1.jlab.org/wiki/images/a/ab/1 | + | *[https://halldweb1.jlab.org/wiki/images/a/ab/1.000GeV_overview.pdf Simulation overview at 1 GeV] |
− | *[https://halldweb1.jlab.org/wiki/images/9/9a/1 | + | *[https://halldweb1.jlab.org/wiki/images/9/9a/1.000GeV_beam.pdf Detector response at 1 GeV] |
− | *[https://halldweb1.jlab.org/wiki/images/9/9a/1 | + | *[https://halldweb1.jlab.org/wiki/images/9/9a/1.000GeV_detector.pdf Detector response at 1 GeV] |
BCAL | BCAL |
Revision as of 15:52, 5 March 2012
Minutes
FCAL
add additional remote scintillator before final Hall B run
Kei's working Geant simulations, see links below. Color coding for particles are
- red - negative charge (e-)
- blue - positive charge (e+)
- green - neutrals (gamma rays)
Note that the code does not track optical photons, only energetic gamma rays.
BCAL
waiting on 1 light guide and the monitoring system to arrive
few simple metal parts to be fabricated
hope to finish detector this week and connect to stand by next week
installation estimate of March 21
scalars will be archived in EPICS
- NEW MEETING TIME ***** MONDAYS AT 1:30 **************