Difference between revisions of "Feb 9, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 4: | Line 4: | ||
# Complete 3 remaining boards for SiPM testing (Chris) | # Complete 3 remaining boards for SiPM testing (Chris) | ||
# Determine if swapped bias pins was accidental or in design (Chris) | # Determine if swapped bias pins was accidental or in design (Chris) | ||
− | |||
− | |||
# Make a second SiPM extraction tool for USM (Jim and Scot) | # Make a second SiPM extraction tool for USM (Jim and Scot) | ||
Revision as of 18:57, 2 February 2012
Action Items from previous meetings
- Populate interface cards to the ADC (Chris)
- Complete 3 remaining boards for SiPM testing (Chris)
- Determine if swapped bias pins was accidental or in design (Chris)
- Make a second SiPM extraction tool for USM (Jim and Scot)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: