Difference between revisions of "Nov 8, 2011 Calorimetry"
From GlueXWiki
(→Minutes) |
|||
Line 32: | Line 32: | ||
=Minutes= | =Minutes= | ||
− | ''Attending: | + | ''Attending: Yi, David, Tim, Beni, John, Elton (JLab); Christina (Athens); Alam, Hayk (USM); Zisis, Andrei (UofR). |
# Announcements | # Announcements | ||
# Review of Action Items | # Review of Action Items | ||
# Monitoring. | # Monitoring. | ||
+ | # Geometry | ||
+ | #* Monitoring contract has been placed | ||
#* [[Media:IMG 0794.JPG]] | #* [[Media:IMG 0794.JPG]] | ||
#* [[Media:IMG 0793.JPG]] | #* [[Media:IMG 0793.JPG]] | ||
+ | #* Photos show that there is room for the Bcal monitoring board. | ||
+ | # Light guides | ||
+ | #* Christina is unsure precisely what light guides they received from Chile. | ||
+ | # Next steps | ||
+ | #* Mount opposing 4 light guides (2 on each side) of miniCal to study cross talk | ||
+ | #* Elton: Fernando has promised to order more compact electronics with summed output to make available to Athens. | ||
# Beam tests in Hall B (fall 2011) (John) | # Beam tests in Hall B (fall 2011) (John) | ||
# FCAL | # FCAL |
Revision as of 16:16, 8 November 2011
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Regina Phone: in LB228 is 306-585-4204
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring.
- Beam tests in Hall B (fall 2011) (John)
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds, mini module
- Fibres
- USM update: [1]
- Simulations/Reconstruction
- Any other business
Minutes
Attending: Yi, David, Tim, Beni, John, Elton (JLab); Christina (Athens); Alam, Hayk (USM); Zisis, Andrei (UofR).
- Announcements
- Review of Action Items
- Monitoring.
- Geometry
- Monitoring contract has been placed
- Media:IMG 0794.JPG
- Media:IMG 0793.JPG
- Photos show that there is room for the Bcal monitoring board.
- Light guides
- Christina is unsure precisely what light guides they received from Chile.
- Next steps
- Mount opposing 4 light guides (2 on each side) of miniCal to study cross talk
- Elton: Fernando has promised to order more compact electronics with summed output to make available to Athens.
- Beam tests in Hall B (fall 2011) (John)
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds, mini module
- Fibres
- USM update: [2]
- Simulations/Reconstruction
- Any other business