Difference between revisions of "Sep 13, 2011 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
|||
Line 33: | Line 33: | ||
=Minutes= | =Minutes= | ||
− | ''Attending: | + | ''Attending:Matt, Kei (IU); Zisis, Andrei (UofR); Elton, David, Beni, Tim, Eugene (Jlab); Will (USM) |
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # Monitoring | ||
+ | # FCAL | ||
+ | ## Construction Status: mechanical, bases (notes from Matt) | ||
+ | ##* | ||
+ | # BCAL | ||
+ | ## Construction Status: builds, [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1809 fibre QA] | ||
+ | # Simulations/Reconstruction | ||
+ | # Beam tests in Hall B (fall 2011) (Kei) | ||
+ | # Discussions of presentations at [[GlueX-Collaboration-Sep-2011]] | ||
+ | # Any other business |
Revision as of 16:14, 13 September 2011
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- JLab Phone: in CC F326 is 757-269-6337; JLab Phone in CC L207 is 757-269-7084
- Athens Phone: in Christina's office is 011-30-210-727-6947
- Regina Phone: in LB228 is 306-585-4204
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Items for followup from previous meeting(s)
- Monitoring
- Athens and UofR needs for light guides from Chile and whether the new or old dimensions can be used. See e-mail from Zisis
- Beam test
- Zisis will start a list of goals and requirements for the Bcal test.
Tentative Agenda
- Announcements
- Review of Action Items
- Monitoring
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds, fibre QA
- Simulations/Reconstruction
- Beam tests in Hall B (fall 2011) (Kei)
- Discussions of presentations at GlueX-Collaboration-Sep-2011
- Any other business
Minutes
Attending:Matt, Kei (IU); Zisis, Andrei (UofR); Elton, David, Beni, Tim, Eugene (Jlab); Will (USM)
- Announcements
- Review of Action Items
- Monitoring
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- Construction Status: mechanical, bases (notes from Matt)
- BCAL
- Construction Status: builds, fibre QA
- Simulations/Reconstruction
- Beam tests in Hall B (fall 2011) (Kei)
- Discussions of presentations at GlueX-Collaboration-Sep-2011
- Any other business