Difference between revisions of "Minutes-7-21-2011"

From GlueXWiki
Jump to: navigation, search
 
Line 5: Line 5:
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking.xlsx Construction Tracking] (Dave)
 
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking.xlsx Construction Tracking] (Dave)
 
#* Status
 
#* Status
#* Wire deadening
+
#* HV tests: results, testing procedures (Lubomir)
# Engineering (Bill)
+
#* Other: wire deadening, iron source
#* Flatness problem: package strongback, gusset rings
+
# Engineering update (Bill)
#* Stringing table modifications
+
# Electronics update (Chris)
# Electronics (Chris)
+
#* HV tests
+
#* Other
+
 
# Chamber testing at EEL126
 
# Chamber testing at EEL126
#* First cell tests with fADC: [http://www.jlab.org/htbin/PHYSICS/halld/enote112.pl?nb=notebook&action=view&page=569 cathode resolution](Lubomir)
 
 
#* Tests with external tracking (Beni)
 
#* Tests with external tracking (Beni)
# Other: [http://www.jlab.org/Hall-D/detector/fdc/tracking/FDC_NamingConvention.pdf naming convention]
+
# Other
  
 
<!--
 
<!--

Revision as of 12:26, 21 July 2011

July 14, 2011 FDC meeting

Agenda

  1. Production Construction Tracking (Dave)
    • Status
    • HV tests: results, testing procedures (Lubomir)
    • Other: wire deadening, iron source
  2. Engineering update (Bill)
  3. Electronics update (Chris)
  4. Chamber testing at EEL126
    • Tests with external tracking (Beni)
  5. Other