Difference between revisions of "Controls Meeting 14-Jul-2011"
From GlueXWiki
m |
|||
Line 9: | Line 9: | ||
** what criteria push us one way or the other? | ** what criteria push us one way or the other? | ||
** E.g: gas system, CAN system, FDC cooling, target, magnets, goniometer, HV/LV channels, crate control, etc. | ** E.g: gas system, CAN system, FDC cooling, target, magnets, goniometer, HV/LV channels, crate control, etc. | ||
− | * [http://halldweb1.jlab.org/mantisbt Mantis task tracker] | + | * [http://halldweb1.jlab.org/mantisbt Mantis task tracker] |
* AOT | * AOT | ||
Revision as of 10:27, 13 July 2011
Agenda
- Announcements - Cody Dickover joining the group
- Minutes from previous meeting 30-Jun-2011
- Fate of the Coil Test meeting - Elliott
- Controls test stand, BOY, etc. - Hovanes
- Solenoid controls in the hall - Josh, Elliott
- Strategy for use of PLC vs IOC vs mixed system - Elliott
- what criteria push us one way or the other?
- E.g: gas system, CAN system, FDC cooling, target, magnets, goniometer, HV/LV channels, crate control, etc.
- Mantis task tracker
- AOT
Time/Location
9:30 AM Thurs 14-Jul-2011 CC F326
Announcements
Next Meeting
Not sure due to summer vacations