Difference between revisions of "Minutes-6-23-2011"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 5: | Line 5: | ||
# Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking.xlsx Construction Tracking] (Dave) | # Production [http://www.jlab.org/Hall-D/detector/fdc/production/FDC_Construction_Tracking.xlsx Construction Tracking] (Dave) | ||
#* Second and third cell status | #* Second and third cell status | ||
− | #* Humidity requirements (related to possible changes | + | #* Humidity requirements (related to possible changes of the AC settings) |
#* Other: using radioactive source at Blue Crab | #* Other: using radioactive source at Blue Crab | ||
# Engineering (Bill) | # Engineering (Bill) |
Revision as of 15:56, 22 June 2011
June 23, 2011 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Second and third cell status
- Humidity requirements (related to possible changes of the AC settings)
- Other: using radioactive source at Blue Crab
- Engineering (Bill)
- Wire deadening
- Package cabling
- Other
- Electronics update (Fernando, Chris)
- Chamber testing at EEL126 (Beni, Lubomir)
- First cell status
- DAQ and software
- Other