Difference between revisions of "Jun 22, 2011 Replacement Solenoid"
From GlueXWiki
(→Action Items) |
|||
Line 33: | Line 33: | ||
#* Provide guidance on location following evaluation | #* Provide guidance on location following evaluation | ||
# Provide estimate weight of coil (Brad) | # Provide estimate weight of coil (Brad) | ||
− | # Provide table of lengths of SSC cable, so that splicing options can be studied | + | # Provide table of lengths of SSC cable, so that splicing options can be studied (Elton) |
# Get name of company that is extruding copper channel for conductor (Elton/Glenn) | # Get name of company that is extruding copper channel for conductor (Elton/Glenn) | ||
− | # Provide information regarding the nitronic rods (non-magnetic stainless) as an option for tensioning supports | + | # Provide information regarding the nitronic rods (non-magnetic stainless) as an option for tensioning supports (Tim) |
− | # Specify guidelines (requirements) for burnout-proof leads | + | # Specify guidelines (requirements) for burnout-proof leads (George?) |
Revision as of 15:11, 22 June 2011
Contents
Items for followup from previous meeting
Tentative Agenda
- 8:30 Meet in CC324. Tour of the Hall D experimental area.
- Elton, Tim
- 9:30 Tour of the test lab and ongoing testing of individual solenoid coils.
- George, Elton
- 10:30 CC324. Group Discussion/ Question & Answer session
- George, Tim, Eugene, Elton, Johathan, Glenn
- Ettore on the phone (not confirmed)
- Lunch
- 1:30 Closeout
- Clarify any remaining questions
- Assign task list for future work
- 2:30 Discussions with Hall B personnel concerning toroid (not confirmed)
Minutes
Attending: Brad Smith, Alexey Radovinsky, Elton Smith, Glenn Young, Eugene Chudakov, George Biallas, Tim Whitlatch, Jonathan Creel
Action Items
- Complete interface drawings with sign off. (Tim)
- Also make available drawings of filler rings.
- Include estimate of Helium level
- Provide parameters of refrigerator and cryogenic system (Johnathan)
- Provide drawings of service cryo cans (both D and C types) (George)
- Add cladding to model and repeat magnetic calculations to check fringe fields (Alexey)
- Send (draft) presentation to everyone (Alexey and Brad)
- Consider options for inserting coil from upstream end.
- Preference is to have the chimney upstream (to minimize saturation downstream and have lower fields at current leads), but will weigh alternatives
- Provide guidance on location following evaluation
- Provide estimate weight of coil (Brad)
- Provide table of lengths of SSC cable, so that splicing options can be studied (Elton)
- Get name of company that is extruding copper channel for conductor (Elton/Glenn)
- Provide information regarding the nitronic rods (non-magnetic stainless) as an option for tensioning supports (Tim)
- Specify guidelines (requirements) for burnout-proof leads (George?)