Difference between revisions of "Minutes-6-16-2011"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
  
 
# Production (Dave)
 
# Production (Dave)
#* First chamber tests (Lubomir)  
+
#* First chamber tests [http://www.jlab.org/Hall-D/detector/fdc/pictures/DSC06259.JPG pic1], [http://www.jlab.org/Hall-D/detector/fdc/pictures/DSC06253.JPG pic2] (Lubomir)  
 
#* Second set wire frame and cathodes
 
#* Second set wire frame and cathodes
 
#* Other
 
#* Other

Revision as of 17:52, 16 June 2011

June 16, 2011 FDC meeting

Agenda

  1. Production (Dave)
    • First chamber tests pic1, pic2 (Lubomir)
    • Second set wire frame and cathodes
    • Other
  2. Engineering (Bill)
    • New encoder
    • Gusset ring
    • Other
  3. Electronics update (Fernando, Chris)
  4. Chamber testing at EEL126 (Beni, Lubomir)
  5. Other


Minutes

Participants: Eugene, Bill, Glenn, Dave, Chris, Beni, Simon, and Lubomir.

Other

At the beginning of the meeting Bill and Dave, representing also other non-physicists, expressed interest in learning more about drift chambers, GlueX detectors and physics and beyond. Eugene, Simon, Beni were happy to answer their questions. We all agreed also to organize a special presentation for them.

Production